As part of the Requalification of the New Central Water Supply Line for the Municipality of Nelas, a Temporary Signage Plan will be implemented starting September 21st for the 2nd phase of the works, affecting a section of Rua Luís de Camões.
The temporary signage plan includes the necessary traffic diversions for access to the section being worked on, with a temporary change in the direction of traffic on Rua Dr. Abel Pais Cabral.
With the start of this 2nd phase, access to the 4 Esquinas area will be more restricted. Motorists are requested to respect the installed signage and use the indicated alternative routes whenever possible.
Pedestrian access and access for residents in the areas affected by the intervention are guaranteed.
The municipality apologizes for any inconvenience caused and thanks everyone for their understanding and cooperation.




