The Municipality of Caminha is proceeding with a plan of proximity interventions in different parts of the municipality, aiming to ensure better conditions for safety, mobility, and quality of life. The works cover all parishes, reflecting an effort to maintain and enhance public spaces.
The Mayor of Caminha Municipality, Liliana Silva, highlighted that "the continuous improvement of living conditions for the population is also achieved through these proximity interventions, which address concrete needs in our parishes. We are working daily to ensure a safer, more qualified, and more attractive municipality for those who live, work, and visit here."
In Vila Praia de Âncora, work is underway on Avenida Dr. Ramos Pereira, involving the replacement of an obsolete main electricity cable and the widening of the pavement by removing the existing cycle path to increase pedestrian safety. On Rua 25 de Abril, ditches and slopes were cleaned to ensure proper rainwater drainage. The area surrounding the Civic Centre was also cleaned.
In the parish of Âncora, preparatory work has begun for a future project on Rua de Costas, aimed at improving circulation and reinforcing safety. In Seixas, on Rua das Pedras Ruivas, improvement actions were carried out to enhance the use of public space and preserve existing infrastructure.
In Venade, Largo da Bouça was prepared for the planting of chestnut trees, an initiative for environmental enhancement and increasing green areas. In Azevedo, following the repair of the retaining wall on Rua das Barracas, damaged by adverse weather, paving of the street is now underway to fully restore circulation and safety for residents and users.
These actions, despite their individual scale, represent concrete and significant improvements in daily life. Regular maintenance of infrastructure, enhancement of public spaces, promotion of road and pedestrian safety, and environmental valorization are permanent priorities for the Caminha Municipality.




